Pocket Knife Böker Magnum Long Lead EDC
$31.99 $38.71 (only EU countries)
In stock

Pocket Knife Böker Magnum Long Lead EDC

SKU: 361819583
0 Reviews
$31.99
In stock
Shipping costs US start at $18.53
Loading...
  • 100+ years experience
  • Fast and secure delivery
  • Secure shopping and payment
  • Product description

  • This Long Lead EDC pocket knife by Böker Magnum is a classic gentlemen’s knife, very much suited for daily use. Its simple, curved design ensures an attractive appearance and its simple yet trusty slip joint system makes sure that the blade is locked down securely, but also makes that it can be folded in easily.

    The blade with satin finish is made of 8Cr13MoV stainless steel, this kind of steel is tough, sharpened easily and very corrosion resistant.

    Its lightly roughened scales are pleasant to handle, offer a lot of grip and are made of G10. This material consists of fibreglass layers soaked in epoxy resin, dried under high pressure, and is very hard and weather-proof. The tip-down pocket clip on the right offers possibility to attach the pocket knife to clothing or other items.

  • Specifications

  • Specifications

    Specifications
    Brand
    Böker
    i Product code
    01SC080
    Type
    EDC knives
    Opening system
    Nail nick
    One-handed opening
    No
    Lock
    Slipjoint
    Weight (gram)
    78
    i Pocket clip
    Yes - Tip down - R
    Designer
    Other
    Type of steel
    8Cr13MoV
    Type of edge
    Plain edge
    Material handle
    G10
    Blade length (mm)
    80
    Opened length (cm)
    18.4
    Closed length (cm)
    10.4
  • Reviews

  • Write Your Own Review
    You're reviewing: Pocket Knife Böker Magnum Long Lead EDC
    Your Rating:
    loader
    Loading...

    You submitted your review for moderation.

    This form is protected by reCAPTCHA - the Google Privacy Policy and Terms of Service apply.