Pocket Knife Böker Magnum Long Lead EDC
| 350 g | 2 kg | 3 kg | 10 kg | 20 kg | 30 kg | 70 kg | Delivery | |
|---|---|---|---|---|---|---|---|---|
| working day working days |
- 100+ years experience
- Fast and secure delivery
- Secure shopping and payment
Product description
This Long Lead EDC pocket knife by Böker Magnum is a classic gentlemen’s knife, very much suited for daily use. Its simple, curved design ensures an attractive appearance and its simple yet trusty slip joint system makes sure that the blade is locked down securely, but also makes that it can be folded in easily.
The blade with satin finish is made of 8Cr13MoV stainless steel, this kind of steel is tough, sharpened easily and very corrosion resistant.
Its lightly roughened scales are pleasant to handle, offer a lot of grip and are made of G10. This material consists of fibreglass layers soaked in epoxy resin, dried under high pressure, and is very hard and weather-proof. The tip-down pocket clip on the right offers possibility to attach the pocket knife to clothing or other items.
Specifications
-
Specifications
Specifications BrandBöker Product code01SC080 TypeEDC knives Opening systemNail nick One-handed openingNo LockSlipjoint Weight (gram)78 Pocket clipYes - Tip down - R DesignerOther Type of steel8Cr13MoV Type of edgePlain edge Material handleG10 Blade length (mm)80 Opened length (cm)18.4 Closed length (cm)10.4 Reviews
- Write Your Own Review