Pocket Knife Böker Magnum Long Lead EDC
32.64 39.49 (only EU countries)
In stock
Enlarge image

Pocket Knife Böker Magnum Long Lead EDC

32.64 39.49 (only EU countries)
In stock
SKU
361819583
In stock
Shipping costs US start at $18.9
SKU 361819583

Secure shopping and payment

Fast and secure delivery

Specialists with product knowledge

Over 100 years experience

Retail store - pick up possible

Customers rate us 4.8/5 :)

Product description

This Long Lead EDC pocket knife by Böker Magnum is a classic gentlemen’s knife, very much suited for daily use. Its simple, curved design ensures an attractive appearance and its simple yet trusty slip joint system makes sure that the blade is locked down securely, but also makes that it can be folded in easily.

The blade with satin finish is made of 8Cr13MoV stainless steel, this kind of steel is tough, sharpened easily and very corrosion resistant.

Its lightly roughened scales are pleasant to handle, offer a lot of grip and are made of G10. This material consists of fibreglass layers soaked in epoxy resin, dried under high pressure, and is very hard and weather-proof. The tip-down pocket clip on the right offers possibility to attach the pocket knife to clothing or other items.

Specifications

Specifications

Specifications
Brand Böker
i Product code 01SC080
Type EDC knives
Opening system Nail nick
One-handed opening No
Lock Slipjoint
Weight (gram) 78
i Pocket clip Yes - Tip down - R
Designer Other
Type of steel 8Cr13MoV
Type of edge Plain edge
Material handle G10
Blade length (mm) 80
Opened length (cm) 18.4
Closed length (cm) 10.4
Reviews

Reviews

Assessment by part
Write Your Own Review
You're reviewing:Pocket Knife Böker Magnum Long Lead EDC
Your Rating
Back to top